July 9-16, 2024
➤Calasiao
July 9, 2024 (Tuesday)
Time: 1:00 PM to 2:30 PM (1.5 hrs)
Areas affected: Portion of Brgy. Poblacion (C31-027)
Purpose: Replacement of busted lightning arrester.
➤Dagupan
July 10, 2024 (Wednesday)
Time: 8:30 AM to 3:30 PM (7 hrs)
Areas affected: Portion of Brgy. Tambac-Tebeng (D12-022 to D12-028)
Purpose: Installation of 1-25KVA distribution transformer and reconductoring of secondary line/load splitting.
➤Dagupan
July 12, 2024 (Friday)
Time: 9:00 AM to 1:00 PM (4 hrs)
Areas affected: Portion of Brgy. Perez Market (D20-037M5)
Purpose: Relocate and replace rotten creo pole.
➤Dagupan
July 12, 2024 (Friday)
Time: 10:00 AM to 3:00 PM (5 hrs)
Areas affected: Portion of Brgy. Lucao (D24-136W4)
Purpose: Relocation of secondary poles and rerouting of secondary line due to house construction.
➤Calasiao
July 12, 2024 (Friday)
Time: 9:30 AM to 12:00 NN (2.5 hrs)
Areas affected: Portion of Sitio Parongking, San Miguel (C29-130XM to C29-130)
Purpose: Uprating of 25KVA to 50KVA distribution transformer.
➤Calasiao
July 13, 2024 (Saturday)
Time: 5:00 AM to 11:00 AM (6 hrs)
Areas affected: Portion of Brgy. Ambonao (Sitio Cruz and Sitio Balani) and Brgy. Cabilocaan
Purpose: Primary line revamp to improve the safety and reliability of our primary distribution line in the area.
➤Calasiao
July 13, 2024 (Saturday)
Time: 5:00 AM to 11:00 AM (6 hrs)
Areas affected: Portion of Brgy. Ambonao (Sitio Balani) and Portion of Brgy. San Miguel (Parongking)
Purpose: Primary line revamp to improve the safety and reliability of our primary distribution line in the area.
➤San Jacinto and Manaoag
July 13, 2024 (Saturday)
Time: 5:30 PM to 6:00 PM (30 mins)
Areas affected: All areas of San Jacinto and Manaoag
Purpose: NGCP’s schedule power interruption to implement the closing of LBS Sapang facing PANELCO III – Urdaneta 1 substation metering facility.